STS-36-Rollout-at-Kennedy-Space-Center

Sts 36 Rollout at Kennedy Space Center

Sts 36 Rollout at Kennedy Space Center

Space Shuttle Photos – The STS-36 vehicle and launch platform were rolled out to Launch Pad 39A on January 25 after the shortest stay in the Vehicle Assembly Building since return-to-flight. The distance between the VAB and Pad 39A is about 3.4 miles. Atlantis is being prepared for launch on Mission STS-36 dedicated to the Department of Defense. Launch is currently targeted for February 22.

keywords: NASA images, STS-36, Kennedy, KSC

STS-1-Pre-Launch-Columbias-First-Flight

Sts 1 Pre Launch (columbia\’s First Flight)

Sts 1 Pre Launch (columbia\'s First Flight)

Space Shuttle Photos – A timed exposure of the Space Shuttle, STS-1, at Launch Pad A, Complex 39, turns the space vehicle and support facilities into a night- time fantasy of light. Structures to the left of the Shuttle are the fixed and the rotating service structure.

keywords: NASA, STS-1, night time shuttle picture , John Young

Space-Shuttle-Atlantis-Takes-Flight

Space Shuttle Atlantis Takes Flight

Space Shuttle Atlantis Takes Flight

Space Shuttle Photos – Space Shuttle Atlantis takes flight on its STS-27 mission on December 2, 1988, 9:30 a.m. EST, utilizing 375,000 pounds thrust produced by its three main engines. The STS-27 was the third classified mission dedicated to the Department of Defense (DoD). After completion of mission, Orbiter Atlantis landed December 6, 1988, 3:36 p.m. PST at Edwards Air Force Base, California.

keywords: NASA, STS-27, Space Shuttle Atlantis

Magellan-Spacecraft-Preparation

Magellan Spacecraft Preparation

Magellan Spacecraft Preparation

Space Shuttle Photos – The Magellan spacecraft with its attached Inertial Upper Stage booster is in the orbiter Atlantis payload bay prior to closure of the doors at T-3 days to launch from pad 39B. Launch of Magellan and Space Shuttle Mission STS-30 is targeted for Friday, April 28, 1989. The 23 minute launch window opens at 2:24 p.m.

keywords: NASA, STS-30, Kennedy, Magellan spacecraft, Atlantis

STS-55-Rollout-Space-Shuttle-Columbia1

STS-55 Rollout (Space Shuttle Columbia)

STS-55 Rollout (Space Shuttle Columbia)

Space Shuttle Photos – The Space Shuttle Columbia rolls to Launch pad 39A from the Vehicle Assembly Building. Already inside the orbiter’s cargo bay is the payload for the upcoming STS-55 flight, the D-2 Spacelab module and Unique Support Structure. This will be the second German-managed Spacelab mission. STS-55 is targeted for liftoff at the end of February.

keywords: NASA images, Columbia, Rollout, Kennedy, KSC

STS-55-Rollout-Space-Shuttle-Columbia x

Sts 55 Rollout (space Shuttle Columbia)

Sts 55 Rollout (space Shuttle Columbia)

Space Shuttle Photos – The Space Shuttle Columbia arrives at Pad 39B early in the morning after being rolled out of the Vehicle Assembly Building the night before. Columbia is scheduled for Launch on Space Shuttle Mission STS-28 in late July on a Department of Defense dedicated mission.

keywords: NASA images, STS-28, Space Shuttle Columbia

STS-45-Launch-Atlantis-Space-Shuttle

STS-45 Launch (Atlantis Space Shuttle)

STS-45 Launch (Atlantis Space Shuttle)

Space Shuttle Photos – With its twin solid rocket boosters and three main engines churning at seven million pounds of thrust, the Space Shuttle Atlantis thunders skyward from Launch Pad 39A. Liftoff of Mission STS-45 occurred at 8:13:40 a.m. EST, March 24, 1992. On board for the 46th Shuttle flight are a crew of seven and the Atmospheric Laboratory for Applications and Science-1 (ATLAS-1). The launch is the second in 1992 for the Shuttle program and Atlantis’ 11th flight.

keywords: NASA images, Atlantis, Space Shuttle Launch, Kennedy, KSC

STS-43-Launch-Space-Shuttle-Atlantis

STS-43 Launch (Space Shuttle Atlantis)

STS-43 Launch (Space Shuttle Atlantis)

Space Shuttle Photos – The Space Shuttle Atlantis streaks skyward as sunlight pierces through the gap between the orbiter and ET assembly. Atlantis lifted off on the 42nd space shuttle flight at 11:02 a.m. EDT on August 2, 1991 carrying a crew of five and TDRS-E. A remote camera at the 275-foot level of the Fixed Surface Structure took this picture.

keywords: NASA images, Space Shuttle Atlantis, Launch

Space-Shuttle-Atlantis-Returns-to-Earth

Space Shuttle Atlantis Returns to Earth

Space Shuttle Atlantis Returns to Earth

Space Shuttle Photos – The Space Shuttle Atlantis returns to Earth after mission STS-30 landing at Edwards Air Force Base, CA. At 3:43:38 EDT. The orbiter Atlantis was launched form Kennedy Space Center May 4, 1989 at 2:46:59 p.m. EDT carrying into low Earth orbit the spacecraft Magellan. It was Atlantis’ fourth shuttle mission. Approximately six hours after launch, Magellan was deployed from the Atlantis payload bay beginning its 15 month long journey to the planet Venus. Crew members of STS-30 were: Commander David M. Walker; Pilot Ronald J. Grabe; and Mission Specialists Mark C. Lee, Norman E. Thagard, and Mary L. Cleave.

keywords: NASA images, Atlantis, Space Shuttle landing, STS-30